Step 2 of 2 · Materials
Measure concrete, steel and formwork together
Enter the column, beam or slab dimensions, then add the approved mix and reinforcement details. Concrete, steel and shuttering stay in one result. Your saved measurements and defaults are already in place; change anything that is different on this job.
What does M25 mean?
M25 states characteristic compressive strength at 28 days; it is not one fixed cement:sand:aggregate ratio. Enter the approved per-m³ design-mix quantities, or price the measured ready-mix volume.
CPWD concrete specificationEnter only reinforcement and concrete information supplied by the project engineer. This calculator measures quantities; it does not design structural members.
Measurements
Measurements
Column
These values stay read-only on the material page.
- Column height
- 9.84 ft
- Column width
- 11.8 in
- Column depth
- 11.8 in
- Number of columns
- 1
Approved mix quantities
Copy these three values from the approved mix design or supplier schedule.
Using saved defaults
Standard sizes, ratios, wastage and rates are kept in one place instead of repeated on every item.